top of page

Solutions.

Confined space works, 12 meter deep shaft over a live raw sewage tunnel. Opening into chamber by stitch coring 150mm diameter holes, upto 700mm in depth through reinforced concrete.Allowing over lapping of holes to create a near perfect straight line. There are 300 off holes made to split the floor/roof into 4 tonne sections, supported with a lifting beam and lifted out with mobile crane.
bottom of page